Friday, February 13, 2009

My best friend and drummer...


It is with a heavy heart that I tell all that my best friend and drummer Matthew McKenna of Camano Island has passed away. He was 44 years of age. His wife Coleen and I have started a memory blog here http://matthewmckenna.blogspot.com/ I had known Matt for the last 8 years in which we became the best of friends.
His favorite scripture was Ephesians 3:20-21

Thursday, November 6, 2008

Me playing my guitar.

This is a bit of neoclassical shred guitar. Played, almost, entirely on the B string. This was recorded by Matt Smith (a.k.a. Ray) at the old Studio McKenna.


I didn't realize until after recording that my Wah pedal was still engaged. DOH!!!


Ebay sucks! Long live Craigslist and Etsy!

This is off-topic for this blog for any of you that follow it, but, I have to rant about this one.

Ebay sucks! For those of you that know me, from time to time I sell on Ebay. It is a way for me to make a little extra cash during the slow season at work. Ebay has seen fit in their infinite wisdom to limit how much you, the seller, can charge for shipping. This may seem like a fair practice at first. But, with Ebay's fees being determined by the listing price and the final selling price, it makes sense that the selling price will be lower to compensate for a higher shipping fee. DUH! The smart shopper takes this into account when buying an item from Ebay. For most sellers it is a way to recoup some of the selling fees. Fees that have gone up and up and up.

Today was the first time I have encountered this regulation. I went to sell a set of 2 reel-to-reel tapes that I purchased at a garage sale this last summer. There is a very limited market for these items and at first I tried to sell them individually but had no luck. So I decided to sell them together as a set for one low price. Then came the listing. I slogged through their NEW AND IMPROVED(?) listing system. That is so slow it's like watching paint dry. When I got to the shipping fees section I was not allowed to put this value over $3.00. Now I don't know if Ebay has done ant of their own shipping lately, but it would cost me much more than the regulated amount to ship this anywhere but my front porch.

So as of today me and my 900+ sales and 99.9% positive rating are going elsewhere. Craigslist and Etsy here I come! I'd even stop using Paypal if I could as Ebay owns that company also. But it is so prevalent I don't think I could do much business on the net without it. So for now Ebay still gets their 3.5% of my internet sales. The Bastards!

Wednesday, August 13, 2008

Center of the floor joists


Just to show you the center. The rebar is the exactly in the middle.

Floor Joists continued


Here is what the floor joists look like. There is a footing under the center that they all sit on. I also doubled the 2x10 at the outer edge where it get connected to the bracked as it was intended for a 4x4.

Footings and Floor Joists

So I dug holes for the footings and poured the concrete and set the brackets. After that I had a roll of heavy duty black plastic and put that down for weed block. Here is one of the set brackets sticking up through the plastic.

Lazy at posts but not work

So I have been pretty lazy at the posts lately. What can I say. It's summer and it's the busy time of year. So this was what was completed as of July 4th. It's the stub wall that the dome will sit on. I had to do this first so I could find where each of the footings and floor joists will fall.

You can just make out 11 anchor that I purchased at a garage sale for a whopping $2.00 for all. Pertty good deal being the last ones I found were $6.00 each. I passed those ones by as I felt I could get a better deal at another G-Sale and I did.

Sunday, June 8, 2008

Just for the fun of it....

Just for the fun of it I placed the part of the dome I had completed on top of the riser walls. At this point it is about 5 feet tall. And to think I was a little worried about the head room inside.

I just had the idea for modifying the door to have an arch to follow the shape of the dome. I'll have to think about that one. Over in Coopeville there is a resturant that I have taken friends and family to. We usually take the boat over as this is faster than driving around Deception Pass. Inside the resturant is a door with a arched top. This has is one of the charms of dining there along with playing chess or another board game.

Riser Walls



Have not made an entry for a little while. But, I have been busy. I've been constructing the riser walls instead of continuing with the dome triangles. With the hubs for the triangles being made of PVC they have a little too much flex and I need it to be solid so I can get a proper placement of the rebar stakes. The walls are first screwed together with 2 deck screws for proper alignment of the walls. Then I add a few galvinized nails to further secure them together.
The riser wall is 18 inches. This will give me enought heigth for a regular size door. Each end of the walls are cut at a 12 degree angle. So the angle difference between one wall and the next is 24 degrees. The pattern for the riser walls is the same as the triangles. It is a B-C-C-B-C-C... pattern until the the circle is complete. Log onto the Desert Domes site for a complete explanation of how this works. Check out the v3 dome as this is the one I am building.


Sunday, May 18, 2008

Building the levels



This is the first level of triangles that will sit on the stub walls. Being I don't have blueprints, and I can't find info on how to calculate the placement of the footings, I'm building the base level of the dome. The part sitting on the ground will be sitting on 18 inch stub walls. The stakes will mark where I need to dig for the foundation. I hope to have the whole circumference done by the end of the week.
Being it is lees than 200 square feet and less than $5000 I can bypass the county for permits and inspections.

3rd Load of Free Lumber

So here was the haul from the third trip to Walt's new house. The poor old Mazda is sagging just a little from all the weight. The long 2x4's strapped to the top are 12 and 14 footers! Just have to remove a few nails. All of this lumber was headed to the burn pile before I asked them to save it for me!!! I definitely have enough to frame the whole thing now.

More Free Wood

I went by the building site again today and picked up another load of wood. I'll go back later today and pick up the rest of what they are going to give me. I might have enough to frame the whole thing. We'll see.