Building the levels



This is the first level of triangles that will sit on the stub walls. Being I don't have blueprints, and I can't find info on how to calculate the placement of the footings, I'm building the base level of the dome. The part sitting on the ground will be sitting on 18 inch stub walls. The stakes will mark where I need to dig for the foundation. I hope to have the whole circumference done by the end of the week.
Being it is lees than 200 square feet and less than $5000 I can bypass the county for permits and inspections.